Analisis Sistem Persediaan Bahan Baku Air Kelapa pada Industri Nata de Coco (Studi Kasus PT Keong Nusantara Abadi)

Authors

  • Shella Puji Pangesti Jurusan Budidaya Tanaman Perkebunan - Politeknik Negeri Lampung
  • Fadila Marga Saty Politeknik Negeri Lampung
  • Dewi Riniarti Politeknik Negeri Lampung

DOI:

https://doi.org/10.25181/jaip.v7i2.1111

Keywords:

EOQ, inventory control, LFL, PPB

Abstract

Inventory is an important thing for the industrial company, so determination of order quantity must be done optimally and reduce the inventory cost.  PT Keong Nusantara Abadi is an industrial company for processing of nata de coco that requires an inventory control system so that the purchase of raw material becomes optimal.  Therefore, this research was conducted to analyze inventory control carried out by PT Keong Nusantara Abadi and determine alternative methods of inventory control of raw material for the company.  This research use Material Requirement Planning (MRP) system.  MRP system has two ways to determine the order quantity called lot sizing decision.  Techniques for determining the quantity of order is Economic Order Quantity (EOQ), Lot for Lot (LFL), and Part Periode Balancing (PPB).  The technique of determining the order quantity that is best use by PT Keong Nusantara Abadi is EOQ which result in lower inventory cost than inventory control techniques by the company that is saved by 9%, 10%, 7,3% consecutively during 2015, 2016, and 2017.

Downloads

Download data is not yet available.

References

Aryantha, M. I. & Anggraeni, N. (2015). Analisis Perencanaan Pengendalian Bahan Baku Menggunakan Teknik Lotting di PT Agronesia Inkaba Bandung. Jurnal Teknik Industri.

Assauri (2008). Manajemen Produksi dan Operasi. Lembaga Penerbit Fakultas Ekonomi Universitas Indonesia. Jakarta.

Direktorat Jenderal Perkebunan. (2015). Statistik Perkebunan Kelapa Indonesia 2013-2015. Jakarta.

Dwika, E. I. (2010). Penerapan Material Requirements Planning (MRP) dalam Perencanaan Persediaan Bahan Baku Jamu Sehat Perkasa pada PT Nyonya Meneer. Unpublished undergraduate thesis, Universitas Diponegoro, Semarang.

Efendi, V. (2015). Analisis Penyediaan Bahan Baku Tebu di Pabrik Gula Ngadiredjo PT. Perkebunan Nusantara X (Persero). Unpublished undergraduate thesis, Universitas Jember, Jember.

Fachrurrozi, F., & Almahdy, I. (2016). Lot sizing material requirement planning pada produk tipe wall mounting di industri box panel. Penelitian dan Aplikasi Sistem dan Teknik Industri, 10(3), 279-293.

Herlambang, A. I. P., & Dewi, R. (2018). Pengendalian persediaan bahan baku beras dengan metode economic order quantity (EOQ) multi produk guna meminimumkan biaya (Studi kasus pada CV. Lumbung Tani Sejahterah). Jurnal Ekonomi dan Bisnis, 2(02), 525-542.

Loho, A. E., & Lolowang, T. F. (2016). Analisis persediaan bahan baku kelapa pada PT. Dimembe Nyiur Agripro (DNA) di Desa Tetey, Kecamatan Dimembe, Kabupaten Minahasa Utara. Agri-Sosioekonomi, 12(2A), 251-260.

Muzayyanah, Suamba, I. K., & Dewi, R. K. (2015). Analisis pengendalian persediaan bahan baku biji kakao pada Pabrik Delicacao Bali di Kabupaten Tabanan. Jurnal Agribisnis dan Agrowisata, 4(4), 268-277.

Utami, W. T. (2012). Analisis Pengendalian Persediaan Bahan Baku Pada PT. XYZ, Jakarta (Studi Kasus pada Painting Plastic Part Honda OEM). Unpublished undergraduate thesis, Institut Pertanian Bogor, Bogor.

Veronica, M. A. (2013). Analisis Pengendalian Persediaan Bahan Baku Beras dengan Metode Economic Order Quality (EOQ) Multi Produk Guna Meminimumkan Biaya pada CV. Lumbung Tani Makmur di Banyuwangi. Unpublished undergraduate thesis, Universitas Jember, Jember.

Published

2019-10-30

How to Cite

Pangesti, S. P., Saty, F. M., & Riniarti, D. (2019). Analisis Sistem Persediaan Bahan Baku Air Kelapa pada Industri Nata de Coco (Studi Kasus PT Keong Nusantara Abadi). Jurnal Agro Industri Perkebunan, 7(2), 97-105. https://doi.org/10.25181/jaip.v7i2.1111

Issue

Section

Article